I helpu i lywio barn am ein cynigion fel rhan o’r Ymgynghoriad Cyn Ymgeisio ymgynghori a chyhoeddusrwydd statudol hwn, mae fersiwn ddrafft o becyn ymgeisio Datblygiad o Arwyddocâd Cenedlaethol Fferm Solar Alaw Môn ar gael i’w weld a’i lawrlwytho drwy’r dolenni isod
​
Dogfennau gweithdrefnol
PEDW DNS Acceptance Notice Letter
​
Dogfennau’r Cais
Arboricultural Impact Assessment
Biodiversity Net Gain Assessment
Collaborative Benefits Report
Consultation Statement
Design and Access Statement
Economic Benefits Statement
Habitats Regulations Assessment: No Significant Effects Report
Planning Statement, including Welsh Impact Statement
Site Selection Report
Supply Chain & Employment Skills Plan
​
Datganiad Amgylcheddol
Non-Technical Summary of the Environmental Statement (English)
Datganiad Amgylcheddol Crynodeb Annhechnegol (Welsh)
Environmental Statement – Volume 1
Chapter 2 Environmental Impact Assessment Methodology
Figure 2.1 Cumulative Schemes Plan
Chapter 3 Site and Development Description
Figure 3.1 Proposed Site Layout
Chapter 4 Alternatives and Design Evolution
Figure 4.1 Design Evolution (March 2021)
Figure 4.2 Design Evolution (June 2021)
Figure 4.3 Design Evolution (August 2021)
Figure 4.4 Design Evolution (March 2022)
Chapter 5 Construction Methodology and Phasing
No Figures
Figure 6.1 Non-Designated Historic Assets
Figure 6.2 Geophysical Survey Results Interpretation Overview
Figure 6.3 Trench Location Plan with Field Numbers
Figure 6.4 Designated Historic Assets
Chapter 7 Landscape and Visual Effects
Figure 7.1 Zone of Theoretical Visibility
Figure 7.3 Topographical Feature Plans
Figure 7.4 Landscape Character Plan
Figure 7.5 LANDMAP Geological, Habitats and Cultural Landscapes
Figure 7.6 LANDMAP Visual Sensory and Historic Landscapes
Figure 7.7 Landscape Character Aspect Areas
Figure 7.8 Landscape Character Evaluation
Figure 7.9 Visual and Sensory Aspect Area
Figure 7.10 Visual and Sensory Evaluation
Figure 7.11 Site Appraisal Plan
Figure 7.12 Visual Appraisal Plan
Figures 7.13-7.17 Landscape Strategy Plans and Planting Schedule
No Figures
No Figures
Chapter 10 Transport and Access
Figure 10.1 Study Area Construction Traffic Route (within Chapter)
Figure 10.2 Public Rights of Way (within Chapter)
Chapter 12 Noise and Vibration
Figure 12.1 Receptor Locations (within Chapter)
Figure 12.2 Baseline Noise Measurement Locations (within Chapter)
Figure 12.3 Specific Sound Level Map (within Chapter)
Figure 13.1 Welsh Government's Predictive ALC Map Showing The Isle of Anglesey
Figure 13.2 Predictive ALC map
Chapter 14 Summary and Residual Effects
No Figures
Environmental Statement - Volume 2
Chapter 1 Introduction
No Appendices
Chapter 2 Environmental Impact Assessment Methodology
Appendix 2.1 EIA Scoping Report
Appendix 2.2 Planning Inspectorate Wales EIA Scoping Direction
Appendix 2.3 Outline BESS Safety Management Plan
Appendix 2.4 Long List of Cumulative Assessment Schemes
Chapter 3 Site and Development Description
Chapter 4 Alternatives and Design Evolution
No Appendices
Chapter 5 Construction Methodology and Phasing
Appendix 5.1 Outline Construction Environmental Management Plan
Chapter 6 Cultural Heritage
Appendix 6.1 Heritage Statement
Appendix 6.2 Geophysical Survey Report
Appendix 6.3 Archaeological Evaluation Report
Chapter 7 Landscape and Visual Effects
Appendix 7.2 Site Appraisal Photographs
Appendix 7.3 Site Context Photographs
Appendix 7.4 Landscape Effects Table
Appendix 7.5 Visual Effects Table
Appendix 7.6 Residential Visual Amenity Assessment
Appendix 7.7 Glint and Glare Assessment
Appendix 7.9 Correspondence with IACC
Chapter 8 Biodiversity
Appendix 8.1 Ecological Appraisal
Appendix 8.2 Bird Survey Report
Appendix 8.3 Great Crested Newt Report
Appendix 8.4 Natural Resources Wales Letter
Appendix 8.5 Agreed Natural Resources Wales Meeting Notes
Appendix 8.6 Isle of Anglesey County Council Letter and Response
Appendix 8.7 Alaw Mon Echoes Project Minutes 6th July 2021
Appendix 8.8 Alaw Mon Echoes Project Minutes 19th June 2023
Chapter 9 Water Environment
Appendix 9.1 Flood Consequences Assessment
Chapter 10 Transport and Access
Appendix 10.1 Transport Statement
Appendix 10.2 Outline Construction Traffic Management Plan
Chapter 11 Air Quality
No Appendices
Chapter 12 Noise and Vibration
Appendix 12.1 An Introduction to Acoustics
Appendix 12.2 Baseline Sound Measurement Results
Appendix 12.3 Typical Construction Plant Details
Chapter 13 Agricultural Land
Appendix 13.1 Agricultural Land Classification
Appendix 13.2 Correspondence with the Welsh Government
Appendix 13.3 Framework Soil Management Plan
Chapter 14 Summary and Residual Effects
No Appendices
​
Darluniau
Site Location Plan – Overall, ENSO-11-01 Sheet 1 of 4
Site Location Plan, ENSO-11-01 Sheet 2 of 4
Site Location Plan, ENSO-11-01 Sheet 3 of 4
Site Location Plan, ENSO-11-01 Sheet 4 of 4
Proposed Site Plan, WAM-01-P02
Inverter/Transformer Stations, AM4.0 Rev 01
Internal Access Road Detail, AM5.0 Rev 01
Fence and Gate Elevations, AM6.0 Rev 01
Weather Station Detail, AM7.0 Rev 01
Control Room Elevations, AM9.0 Rev 01
CCTV Elevations, AM11.0 Rev 01
Storage Container Elevations, AM13.0 Rev 01
Battery Container Elevations, AM12.0 Rev 01
Battery Fence and Gate Elevations, AM14.0 Rev 01
BESS Inverter/Transformer, WAM-01-P20
Battery Compound Preliminary Cut & Fill Layout, PL02 Rev C
Battery Compound Preliminary Cut & Fill Cross Sections, PL03 Rev C
Proposed Access Path Longitudinal Sections, PL04
Substation Fence and Gate Elevations, AM15.0 Rev 01
Substation Surfacing Cross Section, AM16.0 Rev 01
Substation, ICS-20-4089-001 Rev B Sheet 1 of 2
Substation Cross Section, ICS-20-4089-001 Rev B Sheet 2 of 2