top of page
MicrosoftTeams-image (8).png

Official Notice of Acceptance

​

Submitted DNS Documents

​

Procedural Documents

Application Form

Covering Letter (Welsh)

Covering Letter (English)

Application Index

Copy of Acceptance Letter

Copy of Scoping Opinion

Copy of Notice Articles 8 and 9

​

Application Documents

Design and Access Statement

Consultation Report

Planning Statement

Welsh Language Statement

Collaborative Benefits Statement

Site Search Statement

Assessment of Impacts on Agricultural Land

Economic Benefits Statement

Arboricultural Impact Assessment

Habitats Regulations Assessment Report

Green Infrastructure Statement

Supply Chain and Employment Skills Plan

Outline Landscape Environmental Management Plan

Biodiversity Net Gain Assessment

Deed of Gift

​

Environmental Statement 

Non-Technical Summary of the Environmental Statement (English)

Datganiad Amgylcheddol Crynodeb Annhechnegol (Welsh)

​

Environmental Statement - Volume 1

Environmental Statement Contents Page

Chapter 1 Introduction

Figure 1.1 Site Location Plan

Chapter 2 EIA Methodology

Figure 2.1 Cumulative Schemes

Chapter 3 Site and Development

Figure 3.1 Proposed Site Plan

Chapter 4 Alternatives and Design Evolution

Figure 4.1 Site Layout Plan (March 2021)

Figure 4.2 Site Layout Plan (June 2021)

Figure 4.3 Site Layout Plan (August 2021)

Figure 4.4 Site Layout Plan (March 2022)

Chapter 5 Construction Methodology Phasing

Chapter 6 Cultural Heritage

Figure 6.1 Non-Designation Historic Assets

Figure 6.2 Geophysical Survery Results Interpretation Overview

Figure 6.3 Trench Location Plan with Field Numbers

Figure 6.4 Designated Historic Assets

Chapter 7 Landscape and Visual Effects

Figure 7.1 Zone of Theoretical Visibility

Figure 7.2 Site Context Plan

Figure 7.3 Topographical Features Plan

Figure 7.4 Landscape Character Plan

Figure 7.5a Geological Landscapes

Figure 7.5b LANDMAP Landscape Habitats

Figure 7.6a LANDMAP Visual and Sensory Landscapes

Figure 7.6b LANDMAP Historic Landscapes

Figure 7.7 Landscape Character Aspect Areas

Figure 7.8 Landscape Character Evaluation

Figure 7.9 Visual and Sensory Aspect Area

Figure 7.10 Visual and Sensory Evaluation

Figure 7.11 Site Appraisal Plan

Figure 7.12 Visual Appraisal Plan

Figure 7.13-7.17 Landscape Strategy Plan

Chapter 8 Biodiversity

Chapter 9 Water Environment

Chapter 10 Transport

Chapter 11 Air Quality

Figure 11.1 Construction Route

Chapter 12 Noise and Vibration

Chapter 13 Agricultural Land

Figure 13.1 WG Predictive ALC Map

Figure 13.2 Predictive ALC

Chapter 14 Summary and Residual Effects

Chapter 15 Cumulative Effects

​

Environmental Statement - Volume 2

Environmental Statement Volume 2 - Contents Page

Technical Appendix 2.1 – EIA Scoping Opinion Report

Technical Appendix 2.2 – Pins Wales EIA Scoping Direction And IACC Scoping Response

Technical Appendix 2.3 – Outline Battery Safety Management Plan

Technical Appendix 3.1 – Detailed Plans

Technical Appendix 5.1 – Outline Construction Environmental Management Plan

Technical Appendix 6.1 – Heritage Statement Part 1 of 3

Technical Appendix 6.1 – Heritage Statement Part 2 of 3

Technical Appendix 6.1 – Heritage Statement Part 3 of 3

Technical Appendix 6.2 – Geophysical Survey Report Part 1 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 2 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 3 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 4 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 5 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 6 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 7 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 8 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 9 of 10

Technical Appendix 6.2 – Geophysical Survey Report Part 10 of 10

Technical Appendix 6.3 – Archaeological Evaluation Report

Technical Appendix 6.4 – ZTV Model for Y Wethyr

Technical Appendix 7.1 – LVIA Methodology

Technical Appendix 7.2 – Site Appraisal Photographs Part 1 of 3

Technical Appendix 7.2 – Site Appraisal Photographs Part 2 of 3

Technical Appendix 7.2 – Site Appraisal Photographs Part 3 of 3

Technical Appendix 7.3 – Site Context Photographs Part 1 of 3

Technical Appendix 7.3 – Site Context Photographs Part 2 of 3

Technical Appendix 7.3 – Site Context Photographs Part 3 of 3

Technical Appendix 7.4 – Landscape Effects Table

Technical Appendix 7.5 – Visual Effects Table

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 1 of 6

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 2 of 6

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 3 of 6

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 4 of 6

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 5 of 6

Technical Appendix 7.6 – Residential Visual Amenity Assessment Part 6 of 6

Technical Appendix 7.7 – Glint and Glare Assessment

Technical Appendix 7.8 – Photomontages

Technical Appendix 7.9 – Field Numbering Plan

Technical Appendix 8.1 – Ecological Appraisal

Technical Appendix 8.2 – Bird Survey Report

Technical Appendix 8.3 – Great Crested Newt Report

Technical Appendix 8.4 – Natural Resource Wales Letter

Technical Appendix 8.5 – Agreed Natural Resource Wales Meeting Notes

Technical Appendix 8.6 – IACC Letter And Response

Technical Appendix 8.7 – Alaw Mon Echoes Project Minutes 6 July 2021

Technical Appendix 8.8 – Alaw Mon Echoes Project Minutes 19 June 2023

Technical Appendix 8.9 – Email From Welsh Chough Project

Technical Appendix 9.1 – Flood Consequence Assessment

Technical Appendix 10.1 – Transport Statement

Technical Appendix 10.2 – Outline Construction Traffic Management Plan

Technical Appendix 12.1 – An Introduction to Acoustics

Technical Appendix 12.2 – Baseline Sound Measurement Results

Technical Appendix 12.3 – Typical Construction Plant Details

Technical Appendix 13.1 – Agricultural Land Classification: Alaw Mon

Technical Appendix 13.2 – Email Correspondence with Welsh Government

Technical Appendix 13.3 – Framework Soil Management Plan

​

​

Drawings

Site Location Plan – Overall, ENSO-11-01 Sheet 1 of 4

Site Location Plan, ENSO-11-01 Sheet 2 of 4

Site Location Plan, ENSO-11-01 Sheet 3 of 4

Site Location Plan, ENSO-11-01 Sheet 4 of 4

Proposed Site Plan, WAM-01-P02

Cable Section, WAM-01-P19

BESS Inverter/Transformer, WAM-01-P20

PV Elevations, AM3.0

Inverter/Transformer Stations, AM4.0

Internal Access Road Detail, AM5.0

Fence and Gate Elevations, AM6.0

Weather Station Detail, AM7.0

Control Room Elevations, AM9.0

CCTV Elevations, AM11.0

Battery Container Elevations, AM12.0

Storage Container Elevations, AM13.0

Battery Fence and Gate Elevations, AM14.0

Substation Fence and Gate Elevations, AM15.0

Substation Surfacing Cross Section, AM16.0

Drawing 2010-026.PL02 C Preliminary Cut & Fill Assessment Layout

Drawing 2010-026.PL03 C Preliminary Cut & Fill Cross Sections

Proposed Access Path Longitudinal Sections, PL04

Drawing ICS204089001_B Substation Elevations Sheet 1 of 2

Drawing ICS204089001_B Substation Elevations Sheet 2 of 2

​

 

​

​

​

bottom of page